(512) 396-2376 ext. 129 Estimating@heldenfels.com
Large concrete blocks with metal bolts on top are arranged on a dusty construction site. In the background, more concrete slabs and blocks are stacked. The area appears industrial and outdoors.
A blue shield icon with a white check mark in the center, symbolizing security, protection, or verification.
Superior Quality Control
A blue outline illustration of a stopwatch showing the time at approximately 4:22.
Fast Installation
Blue letters
100+ year Lifespan

Equipment Foundations

Heldenfels Enterprises designs and manufactures precast equipment foundations engineered for strength, precision, and long-term performance. These heavy-duty pads provide a stable, level base for critical infrastructure — from solar inverters and transformers to battery energy storage systems (BESS), UAV towers, EV charging stations, and other industrial equipment.

By delivering precast, ready-to-install foundations, Heldenfels helps contractors save valuable time in the field while ensuring consistent quality and reduced site work. Our ability to produce large, custom-engineered foundations means we can meet the most demanding project specifications — bringing speed, reliability, and proven performance to energy and industrial projects across Texas and beyond.

Product Information
Technical Specs
Sizes: Built to Specifications Thickness: Built to Specifications
Height Options: Built to Specifications Installation: Crane ready with lifting hardware
Delivery & Installation

On average, equipment foundations take about 6-8 weeks before they are ready to leave our facility. Our delivery network makes shipping fast and easy! Each project is different and your timeline will be discussed when the order is placed.

Applications & Use Cases

Precast concrete equipment foundations are used to support a wide range of energy and industrial systems, including solar inverters, transformers, switchgear, and battery energy storage units (BESS). These foundations provide a stable, precisely leveled base capable of withstanding heavy loads, vibration, and environmental stress.

Product Information
Technical Specs

Sizes: Built to Specifications
Thickness: Built to Specifications
Height Options: Built to Specifications
Installation: Crane ready with lifting hardware

Delivery & Installation

On average, equipment foundations take about 6-8 weeks before they are ready to leave our facility. Our delivery network makes shipping fast and easy! Each project is different and your timeline will be discussed when the order is placed.

Applications & Use Cases

Precast concrete equipment foundations are used to support a wide range of energy and industrial systems, including solar inverters, transformers, switchgear, and battery energy storage units (BESS). These foundations provide a stable, precisely leveled base capable of withstanding heavy loads, vibration, and environmental stress.

Our Locations

SAN MARCOS, TEXAS (HEADQUARTERS)

Heldenfels Enterprises, Inc.

5700 IH-35 South. San Marcos, TX 78666

Tel: (512) 396-2376

Fax: (512) 396-2381

CORPUS CHRISTI, TEXAS

Heldenfels Enterprises, Inc.

2222 Laredo St. Corpus Christi, TX 78405

Juan Aguirre: (361) 533-1031

Heldenfels Headquarters

Heldenfels Corpus Christi

Frequently Asked Questions

What types of equipment can be supported by Heldenfels’ precast foundations?

Our precast foundations are engineered to support a variety of equipment, including solar inverters, transformers, switchgear, generators, and battery energy storage systems (BESS). Custom designs are available for virtually any heavy or vibration-sensitive equipment.

Why choose precast concrete foundations instead of cast-in-place?

Precast foundations are manufactured in a controlled environment, ensuring consistent quality, strength, and precision. They also reduce on-site labor and curing time, allowing faster installation and minimizing weather-related delays.

Can the foundations be customized for specific project requirements?

Yes. We regularly produce custom foundation sizes, anchor layouts, conduit blockouts, and connection details to meet project-specific equipment and electrical requirements.

How are precast equipment foundations installed on-site?

Foundations are delivered ready to set, requiring only minimal site preparation and crane placement. Once installed, they can be immediately ready for equipment mounting, saving days or even weeks compared to poured-in-place methods.

Are precast foundations suitable for remote or high-volume projects?

Absolutely. Precast foundations are ideal for solar farms, energy storage sites, and industrial developments where large numbers of identical pads are needed. Their repeatable quality and rapid deployment make them perfect for scalable energy infrastructure projects.

Larry Miller, PE

VP of Pre Construction & Business Development

Speak with a Prestressed Wall Panel Expert Today!

Direct message an experienced Prestressed Wall Panel expert about your project. We are happy to discuss your project’s goals and expectations.